Tier 3 - IDOT: Establish fiber connection with MoDOT
Description
Provide connections across PSB and new I–270 bridge
Status
Planned
Timeframe
Short – long term
Stakeholders
Illinois DOT |
---|
Missouri DOT |
Provide connections across PSB and new I–270 bridge
Planned
Short – long term
Illinois DOT |
---|
Missouri DOT |