Reports developed during the conceptual engineering for the Cross-County MetroLink extension, including the final recommendation. The reports for the Cross-County MetroLink Study include:
- Business Plan
- Candidate Design Alternatives
- Capital Operating and Maintenance Cost Estimation Methodology Draft Technical Report
- Table 7 – Capital Cost for Corridor Alternatives
- Major Transportation Investment Analysis (MTIA), Final Report
- Community Engagement Process Engagement Strategies
- Definition of Alternatives
- Design Standards and Policies
- Evaluation Methodology Final Technical Report
- Evaluation Results Final Technical Report
- Final Capital Cost Estimates Report
- Financial Analysis Final Technical Report
- Forest Park Circulator Concepts
- Forest Park Circulator Final Technical Report
- Preliminary Operations Plan Technical Report
- Public Opinion Survey
- Situation Assessment for the Community Engagement Process
- Socio-Economic and Environmental Analysis Final Technical Report
- Socio-Economic and Environmental Methodology Draft Technical Report
- Staff Recommendations on MetroLink Alignment
- Staff Recommendation – Follow-up Information on MetroLink Preferred Alignment
- Staff Recommendation to the Board of Directors
- Strategic Alignment Analysis
- Summary of Phase One Engagement Activities
- System and Alignment Design Concepts
Categories:
Reports
1999
Transportation