Listed below are the meeting packets and other documents for the 2015 Inter-Agency Consultation Group (IACG) meetings.
01/27/2015
Topics covered include: fine particulate (PM2.5) hot-spot analysis to be included in the environmental assessment document for I-270 north project; conformity determinations occurring in 2015; status report – mid-year conformity determination for amendment to FY 2015-2018 Transportation Improvement Program (TIP) and related amendments to Regional Transportation Plan 2040; conformity determination for Connected2045: Long Range Transportation Plan; conformity determination for FY 2016-2019 TIP and related amendments to Regional Transportation Plan 2040.
No February 2015 meeting
03/24/2015
Topics covered include: status report – conformity determination for Connected2045: Long Range Transportation Plan for St. Louis region (Connected2045); and status report – conformity determination for FY 2016-2019 Transportation Improvement Program (TIP) and related amendments to Connected2045.
No April 2015 meeting
05/26/2015
Topics covered include: Motor Vehicle Emission Simulator (MOVES) 2014 implementation considerations; and status reports – conformity determination for Connected2045: Long Range Transportation Plan (Connected2045) and the FY 2016-2019 Transportation Improvement Program (TIP) and related amendments to Connected2045.
No June 2015 meeting
07/28/2015
Topics covered include: information on September 2015 introduction to transportation conformity course information; MOtor Vehicle Emission Simulator (MOVES) 2014 input files review; and conformity determination in calendar year 2016 – what should be first analysis year for regional emissions analysis.
No August 2015 meeting
09/29/2015
Topics covered include: recap of introduction to transportation conformity course; MOtor Vehicle Emission Simulator (MOVES) 2014 fleet age project tool; and 2016 conformity determination regional emissions analysis tables.
No October, November or December 2015 meeting