Listed below are the meeting packets and other documents for the 2013 Inter-Agency Consultation Group (IACG) meetings.
01/29/2013
Topics covered include: update on conformity determination for amendment to FY 2013-2016 Transportation Improvement Program (TIP); conformity determination for FY 2014-2017 TIP – schedule and regional emissions analysis assumptions; time frame for IACG review of draft list of projects for TIP and to preview draft conformity determination document; early progress for the Missouri portion of the St. Louis non-attainment area under the 2008 ozone standard.
03/26/2013
Topics covered include: conformity determination for FY 2014-2017 Transportation Improvement Program (TIP) – schedule and regional emissions analysis assumptions; Missouri Department of Transportation hot-spot checklist; update on draft Conformity Users Guide; Illinois Department of Transportation (IDOT) particulate matter hot-spot analysis air quality modeling project; and transportation conformity PM hot-spot analysis air quality modeling project.
04/23/2013
Topics covered include: status report – conformity determination for FY 2014-2017 Transportation Improvement Program (TIP); project classification list update; and draft Conformity Users Guide.
No May 2013 meeting
06/25/2013
Topics covered include: status report – conformity determination for FY 2014-2017 Transportation Improvement Program (TIP); Conformity Users Guide; and update on the Congestion Mitigation Plan.
No July or August meeting
09/24/2013
Topics covered include: Conformity Determination Users Guide; maintenance plan for 1997 PM2.5 standard; and South County Connector conformity issues.
10/29/2013
Topics covered include: draft motor vehicle emissions budgets from maintenance plan for 1997 annual PM2.5 standard; Conformity Determination Users Guide – revisions to CO or PM2.5 hot-spot analysis considerations for project sponsors document; CO hot-spot analysis consideration; and PM2.5 criteria consideration.
No November or December meeting